Skip to main content
LH North Logo
  • Services
    • All Services
    • Mining
    • Indigenous Collaborations
    • Environmental Response & Traffic Control
    • Municipal
    • Marine & Watercourse Construction
    • Heavy Civil Infrastructure
    • Heavy Logistics & Equipment Rentals
    • LH Crane
  • Projects
  • About
    • About
    • Team & Culture
    • Safety
    • Careers
    • Community Impact
  • Contact Us
An CAT excavator scoops gravel at this LH North construction site. In the background is a new reservoir, also constructed by this company.

Water Pollution Control Plant Upgrades

Client

Municipality of Greenstone

Service

Municipal

Location

Geraldton, ON
An CAT excavator scoops gravel at this LH North construction site. In the background is a new reservoir, also constructed by this company.
Two construction workers in a pit where an excavator has just exposed a white water pipe. This is part of the action during a water pollution control plant upgrade by LH North.
During a water pollution control plant upgrade, the yellow excavator comes to the rescue—again! A metal wall construction in the background.
A drilling rig at a LH North construction site. A worker looks on as the work is set to begin.
A circle in the snow. A temporary wooden wall circle keeps the concrete at bay during this water pollution control plant upgrade project by LH North.
Concrete boxes look like small swimming pools at this LH North construction site for a new water pollution control plant.
At this water pollution control plant upgrade site, LH North built a dam by using a temporary wooden structure. A crane stands by to do the heavy lifting.
This circular concrete structure is the handiwork of an LH North construction team at a water control plant upgrade project.
A steel construction forms a dome over a concrete slab at a water pollution control plant upgrade project by LH North.
A new reservior in the making at a water pollution control plant upgrade project by LH North.
A hydraulic lift crane on site at an LH North project.
A closeup of a new reservoir constructed by LH North. Two workers in full safety gear are checking specs.
There is method to the madness. A water pollution plant upgrade is nearing the finishing stage at this LH North project.

Projects

An LH worker in full safety gear works at compacting sand at the site of a new water booster pumping station. A concrete slab sits in the forefront and a small black building at the back.

Curtis St. Water Booster Pumping Station

Sioux Lookout, ON
View Gallery
On the left, an LH worker stands on a hydraulic lift. Heavy machinery works at constructing a metal wall at this sewage station upgrade project.

Atikokan Sewage Lift Station Upgrades

Atikokan, ON
View Gallery
Our trusted LH North yellow crane lifts the old transformer out on site at this transformer replacement project.

Synergy North Transformer Replacements

Thunder Bay, ON
View Gallery
All Projects
LH North Logo
4 Cooper Rd,

Rosslyn, ON P7K 0E3
(807) 623-2798
(807) 623-0421
info@lhnorth.com
  • Services
  • Mining
  • Indigenous Collaborations & Remote Communities
  • Environmental Response & Traffic Control
  • Marine & Watercourse Construction
  • Municipal
  • Heavy Civil Infrastructure
  • Heavy Logistics & Equipment Rental
  • Projects
  • About
  • Team & Culture
  • Safety
  • Careers
  • Community Impact
  • Contact
© 2025 LH North
  • Privacy Policy
  • Terms of Service
  • AODA 5 Year Plan
  • Bill S-211