View of a bridge and road under construction

MTO DB 2023-6008 Crocker Lake Culvert

Client

Ministry of Transportation Ontario

Service

Heavy Civil Infrastructure

Location

Near White River, ON
Black and red safety cones still mark the spot where an LH North construction site has been. A square concrete pipe makes sure the water of the river flows without damaging the highway.
A view on a highway with a concrete square pipe sitting in a river on the right hand side.
A square concrete form makes five LH construction workers sweat in the early morning. Luckily, a small excavator stands ready to help.
An LH worker walks in the forefront of this image toward a bank of concrete dividers still papered in blue. In the background, an excavator sits on a heap of sand and next to a metal wall.
There is sand everywhere! An excavator and an LH construction worker work at removing sand at this location. There is a forest and heavy clouds in the distance.
White plastic sandbags lie in the forefront of this image. An CAT yellow excavator in the distance sighs at the hard work that still needs to be done at this LH North construction site.
A line of LH workers stands in the distance next to some heavy construction machinery. In the forefront is a river and a temporary metal wall as barrier.
Two construction workers stand on a concrete square set in water on this LH North construction site. Thre is a drill in the background.